19.05.10

Shanghai Sculpture

Finally finished.  The lorry has arrived.   The crane makes easy work of lifting the 1.5 tonnes of sculpture onto the lorry.  But at 6 metres long, it only just fits onto the lorry after a lot of adjustment.

Now at least 6 weeks wait while it is packaged and shipped to China before I travel to oversee the installation in Shanghai.

       

Ben Barrell / +44 7970 872435 / info@benbarrell.co.uk